News
In connection with the implementation of construction activities at the site: „Increasing the capacity of the Border check point at Vidin-Calafat Danube Bridge (entrance and exit) by installing an additional roof structure”, in the period from 20.03.2023 to 20.04.2023, the traffic of motor vehicles will be limited and stopped in stages and hourly on routes 5 and 6 at the entrance to the Republic of Bulgaria/exit Romania at the "Danube Bridge Vidin-Calafat" checkpoint. The section will be signaled with the necessary traffic signals.“Danube bridge Vidin-Calafat” AD
/
Repair works are being carried out on the road surface at km 1+300 in the direction of Bulgaria - Romania during the period from December 20th to 30th 2022. The section is provided with the relevant traffic signs. “Danube bridge Vidin-Calafat” AD
/
Normal traffic has been restored in the section after the traffic lights in direction of Bulgaria – Romania, due to the completion of the repair works before the appointed time. “Danube bridge Vidin-Calafat” AD
/
In the period from December 13th - 15th, 2022, traffic will be restricted in the section after the traffic lights in direction of Bulgaria – Romania, due to the replacement of some components of the bridge facility. Traffic will be regulated by signalmen. Drivers should be cautious and drive with appropriate speed. “Danube bridge Vidin-Calafat” AD
/
Due to the repair of the road surface of the lanes and adjacent infrastructure in both directions of the border checkpoint Danube Bridge Vidin - Calafat on the territory of Romania, a temporary organization of traffic is introduced for the period from 01.11.2022 to 11.11.2022. The section is provided with the necessary traffic signals. “Danube bridge Vidin-Calafat” AD
/