Due to scheduled repair works of the bridge between Vidin and Calafat, from the period 20.07.2020 -14.08.2020, a temporary traffic organization will be introduced. The vehicles crossing from Bulgaria to Romania shall use left lane on the roadway. The section is provided with the relevant road signs! „Danube bridge Vidin-Calafat“ АD
Due to scheduled repair works of the bridge between Vidin and Calafat, from the period 20.07.2020 -14.08.2020, a temporary traffic organization will be introduced. The vehicles crossing from Bulgaria to Romania shall use left lane on the roadway. The section is provided with the relevant road signs! „Danube bridge Vidin-Calafat“ АD