In connection with the construction of a disinfection facility at the Danube Bridge Vidin-Calafat border checkpoint on 18.03.2020 from 10:00 h to 12:00 h, the traffic of vehicles in the area of the border checkpoint will be carried out in one of the two traffic lanes movement in direction from Romania to Bulgaria. On 19.03.2020, due to the installation of the frame of the disinfection facility, from 15:00 h to 16:00 h the traffic of the vehicles will be suspended in the area of the Danube Bridge Vidin-Calafat checkpoint in the direction from Romania to Bulgaria. „Danube bridge Vidin-Calafat“ АD
In connection with the construction of a disinfection facility at the Danube Bridge Vidin-Calafat border checkpoint on 18.03.2020 from 10:00 h to 12:00 h, the traffic of vehicles in the area of the border checkpoint will be carried out in one of the two traffic lanes movement in direction from Romania to Bulgaria. On 19.03.2020, due to the installation of the frame of the disinfection facility, from 15:00 h to 16:00 h the traffic of the vehicles will be suspended in the area of the Danube Bridge Vidin-Calafat checkpoint in the direction from Romania to Bulgaria. „Danube bridge Vidin-Calafat“ АD